Polyethylene remains the largest category within the global ethylene market, with widespread use in consumer packaging, automotive manufacturing, and construction. Low‑density polyethylene (LDPE) demand is projected to grow at a 4.1% compound annual growth rate (CAGR) until 2030, while high‑density polyethylene (HDPE) is expected to grow at a 3.6% GAGR over the same period. Polyethylene, the world’s most widely produced plastic, remains central to global manufacturing. Yet, despite strong fundamentals and a decade-long expansion forecast, new petrochemical project announcements have slowed. The reason isn’t a lack of demand or technical capacity. It’s constrained capital.

Supply Expanded Early but Demand Kept Rising

During the past several years, producers built capacity faster than the market could absorb it. As new facilities came online, operating rates declined and margins compressed. To preserve liquidity, many producers scaled back run rates. While that may have been a practical move in the near term, it also delayed major capital programs.

This has created a backlog of delayed investments in an environment where demand continues to rise. The market need hasn’t gone away. It is simply running ahead of available funding.

Steady Demand Growth Led by International Markets

Petrochemical demand, especially for polyethylene and other ethylene derivatives, continues to rise steadily around the world. Global ethylene demand was approximately 316.8 million metric tons in 2023. With a projected compound annual growth rate of 3.6% through 2030, the world requires about 11 million metric tons of new capacity each year.

Most of this incremental demand is concentrated in countries moving from developing to industrialized economies, where infrastructure growth and consumer spending drive new applications for plastics in packaging, mobility and construction. While demand is robust, it is geographically dispersed, and production capacity does not always follow. The global market still depends heavily on a few regions to supply high-volume, cost-effective output.

North America’s Feedstock Advantage Still Holds

In many parts of the world, petrochemical producers rely on naphtha, a feedstock tied closely to volatile oil prices. In contrast, North American facilities typically run on ethane, an abundant byproduct of shale gas development. The cost difference is significant.

This disparity is captured in what’s known as the competitiveness ratio, which compares naphtha- and ethane-based production costs. When that ratio favors ethane, as it does today, North American plants gain a structural advantage. Even when factoring in logistics to move product to overseas markets, the overall cost to manufacture polyethylene in the U.S. remains favorable. The economics still support building here and exporting abroad, if capital is available to build.

Understanding the Drivers Behind the Slowdown

Capital, not chemistry, is the constraint. Oversupply has trimmed margins, reducing cash flow. At the same time, rising interest rates and uncertainty regarding trade policies have made external capital more difficult to secure. Even companies with strong long-term business cases are reluctant to greenlight multibillion-dollar projects without confidence in short-term financial conditions. Share prices remain sensitive, and equity value is down from previous highs, leaving fewer internal levers to pull.

The Rebound Will Come Fast

History shows that petrochemical cycles don’t turn slowly. Once excess supply is absorbed and margins begin to strengthen, capital will start flowing — and the race to build will be on. Engineering and construction firms will be in high demand, while equipment delivery timelines will stretch and project starts will cluster.

That’s why owners considering expansion can benefit by acting now rather than waiting for conditions to peak. Several steps can help position projects for early momentum when the market turns:

  • Begin foundational project planning. Conceptual design, site evaluations, preliminary permitting and technology screening are low-commitment actions that build flexibility. These efforts can be paused or accelerated depending on market shifts, but waiting to begin them risks falling behind when conditions improve.
  • Engage delivery partners now. Engineer-procure-construct (EPC) teams are actively planning resource allocation for the years ahead. Early collaboration allows for better alignment on project goals, execution strategies and resource availability. It also builds mutual understanding of project priorities before formal contracting begins.
  • Lay the groundwork for commercial agreements. Once investment resumes, competition for equipment and proven EPC talent will increase sharply. Even if your project is nine to 12 months from mobilization, early agreements can secure preferred status in partner workflows and stabilize planning assumptions.

The next wave of petrochemical investment won’t come gradually. It will arrive with urgency once market confidence returns. Owners who begin preparing now — through early technical studies, stakeholder coordination and delivery alignment — will be first to act when capital is available.

 

Meeting global demand for polyethylene starts with scalable, efficient infrastructure. Our integrated team delivered one of the world’s largest ethylene-to-plastics facilities with speed, safety and cost certainty. Discover how integrated EPC delivery can advance complex industrial projects.

Explore the Project

by
With almost 30 years of experience focused in the refining, petrochemical, specialty chemical and renewables industries, Kevin Syphard has worked in all phases of engineering projects, from opportunity identification, technology transfer and scope development through detailed design and construction. He leads Burns & McDonnell growth in the petrochemical market.