Burns & McDonnell
burnsmcd.com
June 18, 2026 Power

How Early Engagement and Integrated Teaming De-Risk Substation Projects

In the world of complex energy infrastructure, the traditional path for delivering substation projects, featuring a sequential handoff from design to procurement to construction, is filled with potential challenges. Each transition has potential for misalignment, rework and cost growth, adding layers of risk that can jeopardize project success.

By shifting critical decisions upstream through early engineering engagement and leveraging integrated teams, the risk profile of a project can be fundamentally changed. When an EPC firm like Burns & McDonnell can team early with internal construction partners like AZCO, it is able to do more than just design for constructability — it can unlock alternative delivery solutions that offer greater certainty in cost, schedule and quality.

Read More

  • Power (504)
  • Environmental (318)
  • Construction (294)
  • Oil, Gas & Chemicals (228)
  • Manufacturing & Industrial (201)
  • Water (196)
  • Transportation (138)
  • Government & Military (126)
  • Commercial, Retail & Institutional (105)
  • Telecommunications (96)
  • Aviation (94)
  • Engineering (87)
  • Operations & Maintenance (62)
  • Commissioning (37)
  • Strategic Partners (37)
  • Mining & Minerals (24)
  • Program Management (24)
  • Architecture (15)
  • STEM (11)
  • Ownership (3)
  • Vlog (3)

Month

  • June 2026 (3)
  • May 2026 (4)
  • April 2026 (6)
  • March 2026 (6)
  • February 2026 (5)
  • January 2026 (5)
  • December 2025 (5)
  • November 2025 (4)
  • October 2025 (6)
  • September 2025 (3)
  • August 2025 (6)
  • July 2025 (9)
Post Image
Manufacturing & Industrial
Q&A: What Food Manufacturers Need to Know Now About Natural Color Conversions
by The Burns & McDonnell Team
Post Image
Manufacturing & Industrial
Q&A: The Truth About Hygienic Food and Beverage Facility Design
by The Burns & McDonnell Team
Post Image
Manufacturing & Industrial
Bridging the Manufacturing Production Gap With Innovative Solutions
by The Burns & McDonnell Team
Post Image
Water
Optimization Is a Key Factor for Membrane Treatment Facility Design
by Steven Thompson
Post Image
Power
Mastering Voltage Regulation for Reliable Power
by The Burns & McDonnell Team
Post Image
Environmental
Healthcare Staff Reductions Threaten Regulatory Compliance
by Scott Myers
Post Image
Water
Preparing Water and Wastewater Utilities for a Pandemic
by The Burns & McDonnell Team
Post Image
Aviation
Sustainable Practices Can Create Disaster Resilience
by Tara Krahe
Post Image
Manufacturing & Industrial
Considering Automation for the New Normal
by Alfredo Valadez
Post Image
Construction
Safety Is First: Best Practices for Safely Returning to the Workplace
by Jamie Butler

Subscribe to your source for timely news, happenings and perspective on issues across the AEC landscape.

Contact